Portland-Area Dangerous Roads: What the Latest Crash Data Shows—and What's Changed
On 122nd Avenue, the crash pattern reaches well beyond a single intersection. Five major crossings—from Halsey Street to Powell Boulevard—each recorded at least 54 fatal or injury crashes during 2020–2024 in Portland’s high-crash analysis. On 82nd Avenue, Glisan, Burnside and Powell also appear in that analysis. The concern is not confined to one junction on either road.
What has changed is equally important. The Portland Bureau of Transportation (PBOT) reported 82nd Avenue’s Major Maintenance project substantially complete in November 2026, and an Outer Stark phase finished in January. Outer Division has an actual before-and-after crash evaluation. Farther west, TV Highway’s major transit and safety project is still ahead.
The newest complete published Oregon crash-data year confirmed for this article is 2024; the Oregon Department of Transportation (ODOT) released its 2024 highway crash-rate tables in October 2026. Portland’s current intersection analysis covers 2020–2024, while the project updates below extend through November 2026. Together, they support a close look at selected Portland-area corridors—not a new statewide danger ranking.
The important differences at a glance
- 122nd and 82nd: repeated crash concentrations at named crossings.
- 82nd and Outer Stark: documented construction milestones, with specific project boundaries.
- Outer Division: measured crash results, including a mixed finding for the most severe crashes.
- TV Highway: newly published segment data, but major improvements still planned for future years.
122nd Avenue: Repeated Problems at Major Crossings
Halsey, Glisan, Stark, Division and Powell all meet 122nd Avenue at intersections included in PBOT’s overall high-crash analysis. The agency considers crash frequency, traffic-adjusted collision rates and crash severity—not just the largest count.
| Crossing on 122nd Avenue | Fatal/injury crashes included in PBOT’s analysis, 2020–2024 |
|---|---|
| NE Halsey Street / NE 122nd Avenue | 75 |
| NE Glisan Street / NE 122nd Avenue | 71 |
| SE Stark Street / SE 122nd Avenue | 61 |
| SE Division Street / SE 122nd Avenue | 77 |
| SE Powell Boulevard / SE 122nd Avenue | 54 |
These figures describe each intersection and its related crashes. They exclude property-damage-only collisions and are not a total for all of 122nd Avenue. The useful finding is the repetition: several major crossings along the same road appear in the city’s analysis.
The pedestrian picture extends beyond those five major intersections. PBOT’s separate pedestrian table records one person killed and one seriously injured at SE 122nd Avenue and Ash Street during 2020–2024. Its preliminary 2025 deadly-crash report identifies another pedestrian death near that crossing on August 3, 2025; the report describes the location as approximate.
That recurrence matters even though it does not establish that the collisions happened in the same way. For someone checking a particular walking route, PBOT’s separate pedestrian analysis adds information that the overall intersection table alone would miss.
82nd Avenue: Documented Crash Crossings, With Major Work Substantially Complete
Three familiar 82nd Avenue crossings stand out in the same 2020–2024 overall intersection analysis:
- NE Glisan Street / NE 82nd Avenue: 56 included fatal/injury crashes.
- E Burnside Street / 82nd Avenue: 39.
- SE Powell Boulevard / SE 82nd Avenue: 63.
Alongside that crash history is a concrete construction milestone. PBOT’s November 17, 2026 Major Maintenance update says the project was substantially complete, with remaining punch-list work and intermittent lane closures in November and December.
The scope is 2.5 miles in two separate segments: NE 82nd from Fremont to Schuyler, and SE 82nd from Mill to Foster. That is substantial work, but it is not reconstruction of the entire avenue. Nor do the 2020–2024 crash figures measure what happened after this late-2026 milestone.
For people traveling through those segments, the project page is the useful next stop for remaining-work notices. For assessing the result, the next question is different: what will later crash records show after the work?
Powell and Outer Stark: Specific Trouble Spots and a Completed Stark Phase
Powell Boulevard, SE 86th–136th Avenues
ODOT’s October 2026 publication records 93 reported crashes in 2024 on the 2.48-mile stretch of Powell between SE 86th and SE 136th avenues. Its rate was 4.56 crashes per million vehicle-miles traveled—a measure that accounts for how much driving occurred on the segment, not a fatality rate. The figures appear on printed page 90 of the highway crash-rate tables.
This gives Powell another kind of evidence alongside the 82nd and 122nd intersection findings: a year’s reported crashes on the main roadway along one defined stretch. It is not a whole-Powell count, and it should not be added to the five-year intersection numbers.
Outer Stark, From the 122nd and 139th Crossings to Phase III
Stark’s intersection findings extend east of 122nd. At SE Stark Street and SE 139th Avenue, PBOT’s 2020–2024 table records 34 included fatal/injury crashes, with one person killed and six seriously injured.
The Safer Outer Stark project is moving in phases. According to PBOT’s November 5, 2026 update, Phase III—from 108th to 122nd avenues—finished in January 2026, including paving, accessible corner ramps and protected bike lanes.
The broader project corridor reaches from 108th to 162nd. Later phases remained in design, with work planned for 2027. That geography is important: finishing the western phase does not mean the work toward 139th or 162nd is finished. The update tells readers where construction has advanced, rather than supplying a measured crash reduction.
Outer Division: What an Actual Before-and-After Evaluation Found
Outer Division offers something a completion notice cannot: a comparison of crashes before and after a project.
For SE Division Street between 80th and 174th avenues, PBOT compared 2023 crashes with the annual average during 2015–2019, before construction. Its Outer Division Safety Project evaluation found:
- All crashes: 146 in 2023, compared with a pre-project average of 307.4 per year.
- Pedestrian crashes: five in 2023, compared with an average of 14.6 per year.
- Fatal and serious-injury crashes: 13 in 2023, compared with an average of 11.4 per year.
The first two findings show substantial declines in the observed counts. The third moved the other way: fatal and serious-injury crashes increased in the raw comparison.
PBOT also compared Division’s change with worsening crash trends citywide and in District 1. On that area-trend-adjusted comparison, it reported a 26% relative reduction in fatal and serious-injury crashes. In plain terms, Division’s severe-crash count rose, but less than the comparison trend. The adjusted result does not mean the actual count fell.
This is a more informative result than a simple “the project worked” or “the project failed.” It shows improvement in total and pedestrian crash counts while leaving a serious concern in the raw severe-crash numbers. The evaluation covers one post-project year, and several interventions—including TriMet’s Division project—overlapped, so it cannot isolate a permanent effect or credit one feature alone.
For a fuller explanation of that comparison, see our Outer Division evaluation example in the Portland crash-data guide.
TV Highway: New Segment Evidence, With Major Improvements Still Ahead
West of Portland, ODOT’s newly published tables give precise 2024 observations for two short TV Highway segments:
| TV Highway segment | Published length | Reported mainline crashes, 2024 | Crashes per million vehicle-miles traveled |
|---|---|---|---|
| SW 178th Avenue to SW 187th Avenue | 0.47 mile | 31 | 5.25 |
| Cornelius Pass Road to SE 67th Avenue, Hillsboro | 0.49 mile | 37 | 6.48 |
These are specific pieces of the corridor, not rates for the entire Beaverton-to-Forest Grove route. ODOT’s mainline tables exclude ramps, connections and frontage roads; the entries appear on printed page 95 of the 2024 crash-rate publication.
An older finding helps explain the importance of pedestrian access in the corridor’s safety planning. Metro reports that 46% of serious pedestrian injuries and pedestrian fatalities on TV Highway during 2017–2021 occurred within 100 feet of a transit stop. That proximity makes crossings and transit access important places to examine; it does not show that bus stops caused the crashes or that the people injured were transit passengers.
The major response is still ahead. TriMet’s TV Highway Transit & Safety Project, connecting Beaverton, Aloha, Hillsboro, Cornelius and Forest Grove, anticipates construction from spring 2028 through fall 2030, with service beginning in fall 2030. Proposed station improvements include lighting and crossings.
For someone using TV Highway now, the distinction is practical: those are planned improvements and anticipated dates, not safety benefits already delivered in 2026.
McLoughlin Boulevard: A Measured Segment and County-Flagged Crossings
On McLoughlin Boulevard between Milwaukie and Gladstone, ODOT records 71 reported crashes in 2024 on the 2.39-mile segment from Courtney Avenue to Jennings Avenue. The published rate is 2.90 crashes per million vehicle-miles traveled; see printed page 35 of the ODOT tables.
Separately, Clackamas County’s 2026 draft Transportation Safety Action Plan identifies McLoughlin Boulevard at Roethe Road and McLoughlin Boulevard at Concord Road as prominent locations in its intersection analysis, which uses 2019–2023 crashes. As of the research cutoff, the county still publicly labeled the plan a draft.
The two sources make the picture more specific: one measures a defined stretch of road, while the other flags particular crossings for attention. They are not additional crash counts to combine. For the wider county context, our guide to Clackamas County’s draft intersection priorities explains what those designations mean.
Checking Your Crossing—and Getting Help After a Collision
To check a Portland location, start with PBOT’s intersection page and look for the 2020–2024 overall and pedestrian tables. The street charts on that same page use an older period, so check the heading before comparing numbers. For changes on the ground, use the corridor’s project page: it answers where a phase ends, whether work is complete and what remains planned.
For a different period and broader geography, our historical 2014–2016 Oregon road list remains available. It is a historical companion, not a before-and-after baseline for the locations covered here.
A road’s crash history can help frame questions, but it does not establish what caused a particular collision or who was responsible. If you were injured in a Portland-area collision and want to discuss your situation, contact Johnson Law about a Portland car-accident claim. The individual collision—not a road’s place on a public list—is the starting point.
This article provides educational information only, not legal advice.
Frequently Asked Questions
What is the latest complete published Oregon crash-data year?
2024 is the latest complete published year confirmed for this article as of November 25, 2026. ODOT published its 2024 highway crash-rate tables in October 2026. The agency also offers 2025 preliminary fatal and serious-injury data, but warns that lesser-injury and property-damage-only records continue to be added; that is not the same as a complete published year. See ODOT’s crash data products and reporting portal.
Are 82nd Avenue’s safety improvements finished?
PBOT’s November 17, 2026 update says the Major Maintenance project was substantially complete within its two segments—Fremont–Schuyler and Mill–Foster—with remaining work and intermittent closures. That statement does not establish completion of every project on 82nd Avenue.
When are TV Highway’s transit and safety improvements expected?
TriMet anticipates construction from spring 2028 through fall 2030, with service starting in fall 2030. These are planned dates; check the linked project page for subsequent schedule updates.
Sources and Reading Notes
The figures above come from agency publications, not a combined ranking. Page references below are the documents’ printed page numbers.
- ODOT, 2024 Oregon State Highway Crash Rate Tables — published October 2026; 2024 segment observations. McLoughlin: p. 35; Powell: p. 90; TV Highway: p. 95. Section-boundary and comparison guidance: pp. 2 and 25–26.
- PBOT, High Crash Network streets and intersections — overall and pedestrian intersection analyses for 2020–2024; separate street charts use 2017–2021.
- PBOT, Portland 2025 Deadly Traffic Crash Report — March 2026 report using preliminary 2025 fatality data; the approximate Ash/122nd location appears in Table 2, p. 11.
- PBOT, Outer Division Safety Project Evaluation Report — June 2024, updated August 2025; compares 2023 with the 2015–2019 annual average. Results and adjustment method: pp. 4–5 and 23–24.
- PBOT, 82nd Avenue: Major Maintenance and Safer Outer Stark — construction-status updates dated November 17 and November 5, 2026, respectively.
- Metro, Tualatin Valley Highway transit and safety project — “Background—Safety” reports the 2017–2021 transit-stop-proximity finding. TriMet’s project page supplies the anticipated construction and service schedule.
- Clackamas County, Transportation Safety Action Plan Update and linked 2026 draft plan — 2019–2023 observations; intersection findings appear on pp. 13–17, especially Table 1. Draft status was retained at the November 25 research cutoff.
Client-First Fee Promise
Client First = Bills First, Fees Second
Your unpaid medical bills do not have to make your lawyer's fee bigger. Johnson Law subtracts qualifying medical bills before calculating our fee, helping clients keep more of their settlement.
Applies to qualifying cases. Results vary.